1. The mould manufacturing cycle is long, key artifacts, process the lack of a clear guidance
Mold factory generally continuation of traditional mold workshop management mode, the lack of planning control, processing also lack process guidance. Moulding teacher's personal consciousness to a great extent, decided to do the mould manufacturing cycle, so very long cycle generally. Master moulding personal ability, to the mold processing program better, manufacturing cycle is relatively short, teacher competence in general, processing may follow up does not reach the designated position, manufacturing cycle becomes longer.
Master mold factory circulated a words: \"small die than big die hard!\" Large size mold needed parts, mold will require small specification, process is not easier than large size mould, cause small specification mould manufacturing cycle cannot be improved.
Since machining process depends on the pattern master, rather than explicit processing plan guidance, moulding teacher once the lack of overall understanding of workpiece processing content, it may cause leakage processing or processing does not reach the designated position phenomenon, repeat this computer processing are inevitable, possession of machine tool resources and also delayed the production schedule of the mould at the same time, this is a major cause of the relative to extend the manufacturing cycle.
2. The production management is difficult to control, sex work difficult to mold factory planning
Under the old system of mould workshop, and machining of the lack of plan, the control of workpiece when to use the computer, when completed, only very few people know is in charge of the manufacture of the mould, other researchers are difficult to grasp the whole set of mold progress, so also will not be able to form some processing data written records, led directly to the workshop management is difficult to play to the role of the supervision, coordination, and control of the production will be more don't talk about.
Also, no record of processing data, also cannot reflect the fitter group, the saturation and the work of each platform department's use of the key equipment, this brings to the mold factory to undertake new orders and so on programmatic work harder.
3. The cost accounting
No processing data back to the finance department, the processing cost cannot be calculated more with less, not to mention the mould cost control.
Mould ERP to the materials issue, BOM no strict requirement, even don't have to set up.